- Compleition Date
- May 2010
- Contracting Entity
- City of Sedona
Tiffany Construction was the contractor for the Design and Construction Phases of this CM@R project. During the design phase Tiffany met with the design engineer and provided constructability reviews, value engineering and prepared estimates for best value alternates. Also, TCC prepared a master construction schedule, traffic control plan, designed and reviewed the SWPPP plan, Sub-Contractor Selection plan, attended meetings with the city and design engineer and prepared the GMP. The construction part of the project included the excavation and installation of 1,760 LF of Storm Drain Channel. The major items of work include: 251 LF of dual 78” SRMP, 154 LF of dual 72” SRMP, 332 LF of dual 72” CMP, 410 LF of dual 78” CMP, 430 LF of 142” x 91” CMPA, 125 LF of 12” through 48” CMP, 14 LF of Concrete Transition Channel, 340 SF of Concrete Channel modification, custom grated headwall, custom junction structure, concrete channel with baffles, various removals, traffic control, landscaping, SWPPP construction staking, riprap swales, AC paving at street crossings and several other miscellaneous items.
Tiffany took over as both the Design and Construction Phase Contractor for this CMAR project after the contractor selected initially was not able to meet the City of Sedona’s budget. When we became involved in the design phase of the project, the plans were at 80% complete status. This provided us an opportunity to work with the city and design engineer to incorporate value engineering options and constructability reviews in a combined effort to achieve the budgeted amount. Tiffany not only was able to meet the city’s budget but we saved the city an additional $161,410 from the GMP. Also, we prepared a master construction schedule, traffic control plan, designed and implemented the SWPPP plan, Sub-Contractor Selection plan, attended meetings with the city and design engineer, and prepared the GMP.
Tiffany received numerous accolades from the residents and property owners for our communications and processing of the job and minimizing disruptions to all concerned.