- Completion Date
- February 2017
- Contracting Entity
- Salt River Project
TCC was recently awarded a contract to re-line an existing evaporation pond at the SRP Navajo Generating Station in Page, AZ. The project entails removing sludge and liner from the existing S-3 Pond before beginning improvements. These improvements include excavating and installing leak detection piping and electrical conduits, the construction of a 22’ deep wet well, electrical connections, and pump controls before grading and installing the new updated liner system.

