Soldier Wash Drainage Improvements

Project Type

Drainage

Delivery Method

Job Order Contracting (JOC)

Project Description

Completion Dates
  • Soldier Wash Phase 4B – March 2018
  • Soldier Wash Phase 4A – July 2017
  • Soldier Wash Portal Phase – June 2016
  • Soldier Wash Pedestrian Bridge – August 2016
City of Sedona
Contracting Entity

This project consists of four phases for the City of Sedona’s drainage improvement plan for Soldier’s Wash which runs through the T’laquepaque shopping village. After completing the new vehicle bridge and pedestrian bridge crossing last year, TCC has begun the rehabilitation and improvement of the channel. Beginning by clearing the channel of storm water debris, trees, brush and squaring up the wash profile, installation of RediRock and CMU block began. This block will prevent channel erosion while being aesthetically pleasing. Once the block installation is complete, the bottom of the channel will be lined with concrete furthering the erosion mitigation. These four phases included demolition, relocation of multiple sewer, water, gas and dry utilities, 4139 cy of excavation, 12,660 sf of Redi-Rock channel bank protection, 23,880 sf of 6” concrete channel bottom, 553 lf of CMU retaining walls, 55 cy of shotcrete, 226 cy of rip rap, 8’ H x 22’ W x 32’ L precast box culvert and 8 x 30 clear span corton steel pedestrian bridge and abutments. Working with the City of Sedona, T’laquepaque, Los Abrigados and El Portal management has ensured Spring Break season came and went with minimal interruption and visitor access and safety were maintained throughout all four phases.

A nearly finished concrete drainage channel lined with bricks

Partner with TCC for your next project