Completion Date Fall 2026 Contracting Entity Coconino County These projects consisted of over 3000 LF of 72" diameter CMP, building multiple styles of concrete channels, box culverts and utility relocates. Tiffany worked with Coconino County and their multiple design...
Projects
Coconino County Off-Forest Flood Mitigation
Completion Date Fall 2023 Contracting Entity Coconino County These projects consisted of over 3000 LF of 72" diameter CMP, building multiple styles of concrete channels, box culverts and utility relocates. Tiffany worked with Coconino County and their multiple design...
Spruce Avenue Wash Improvements
Completion Date December 2022 Contracting Entity Coconino County This project consisted of installation of a channel, consisting of both shotcrete and concrete channels, in a highly congested neighborhood in Flagstaff, Arizona, that has seen some an excessive amount...
The Phoenician
Completion Date September 2022 Contracting Entity Replay This project consisted of 51 individual lots, as well as 6 other large buildings and an interior roadway, all pushing against Camelback Mountain. With over 200,000 CY of rock excavation, Tiffany also performed...
Sedona Shadows
Completion DateOctober 2021 Contracting EntityMHC Sedona Shadows LLC The work consisted of building 10 new pads in Sedona, Arizona. The excavation was performed in Rock and required the use of hammers for the building pads, as well as the detention basin and...
Thunder Mountain Drainage Improvements
Completion Date July 2020 Contracting Entity Coconino County This project consisted of multiple utility relocates including multiple water and sewer lines. Tiffany crews also installed over 1850 LF of CMP drainage pipe, in a tight area of a subdivison, adjacent to...
Arlington Valley Evaporation Pond C
Completion Date July 2020 Contracting Entity APS The scope of work for this project consisted of creating a new 825' x 540' evaporation pond, and extending the existing 20' channel over 1800'. On this project there was over 100,000 CY of excavation, installation of...
Flagstaff Ranch Estates
Completion Date June 2020 Contracting Entity The Ranch Estates A subdivision in Flagstaff, Arizona, the Estates was a project that had 16 individual 10 acre parcels within Forest Highlands. Work consisted of clearing and grubbing while maintaining as much of the...
Westpark Wickenburg ELS
Completion Date May 2020 Contracting Entity MHC Westpark The scope of this work consisted of building 24 individual lots, with 20' wide roadway, and drainage improvements using retention basins with over 25' high slopes. This project was completed in Wickenburg,...
APS WR 45 Acre Leak
Completion Date April 2020 Contracting Entity APS The scope of work consisted of cleaning the slopes for a liner inspection, the installation of rub sheets for equipment and worker access. The water thatwas contained in the 45 acre reservoir was pumped into an...
Juniper Area Drainage Improvements
Completion Date July 2019 Contracting Entity City of Sedona This project for the City of Sedona consists of installation of approximately 1000 lf of 42" CMP & SRP with a small portion of 36" CMP installation to improve drainage along Juniper Lane. Complete roadway...
Coffee Pot Drainage Improvements
Completion Dates Little Elf Phase - June 2019 Sanborn Crossing - June 2018 Grasshopper Phase - June 2018 Coffee Pot Crossing - March 2017 Coffee Pot Phase - 2016 Contracting Entity City of Sedona We are currently constructing the third of four phases of this JOC...