- Completion Date
- July 2016
- Contracting Entity
- Palo Verde Generating Station
Palo Verde Nuclear Generating Station (PVNGS), the nation’s largest power producer, brought together a team with TCC as the prime contractor to start the Generrex Project in August 2014. Since the commissioning of PVNGS in the 1980’s, this project is the first substantial addition to its power block. During the two years of construction our team constructed approximately 1500 cubic yards of structural concrete including structural slabs as thick as two feet and walls as high as 23 feet. Additionally, water lines, sewer lines, and fire lines were relocated under the strict protocols required at PVNGS before asphalt paving could be completed. This project has required extensive cooperation, communication, and coordination between all team members to ensure the schedule, budget, and stringent safety guidelines were met. With over 91,000 TCC man hours invested in this project, we are proud to say not a single incident occurred.