Spring Valley Road

Project Type

Drainage

Delivery Method

Job Order Contracting (JOC)

Project Description

Completion Date
August 2008
Contracting Entity
Coconino County

This project consisted of clearing and grubbing, road reconstruction (including placement of 6016 cy of borrow material to elevate the roadway), 65 lf reinforced concrete box culvert, 118 lf 33″ x 49″ CMP arch placement and grading of 969 cy of recycled asphalt pavement. TCC obtained, coordinated and supervised the survey, geotechnical and quality control functions of the project through selected qualified subcontractors in addition to the structural concrete subcontractor hired to complete the box culvert. TCC designed the traffic control and storm water pollution prevention plans. We were praised for our efforts for maintaining safe access for vehicles and pedestrians during construction. The project was completed three weeks ahead of schedule.

Completed drainage culvert with front loader on top

Partner with TCC for your next project