- Completion Date
- September 2022
- Contracting Entity
- Replay
This project consisted of 51 individual lots, as well as 6 other large buildings and an interior roadway, all pushing against Camelback Mountain. With over 200,000 CY of rock excavation, Tiffany also performed all of the onsite utilities and drainage structures.

